Fayetteville Bee Hollow Road (S1077)

Fayetteville Bee Hollow Road is a 150.0 MW battery interconnection project in St. Clair, Illinois with a current status of operational. It is proposed to connect at Fayetteville Bee Hollow Road.

150.0 MWCapacity
OperationalStatus
Market
BatteryTechnology

Project facts

Canonical nameFayetteville Bee Hollow Road
Queue IDS1077
Statusoperational
Source statusActive
Market
TechnologyBattery
Capacity150.0 MW
StateIllinois
CountySt. Clair
Point of interconnectionFayetteville Bee Hollow Road
Requested (queue) date2025-01-13
Proposed in-service date2029-09-01
Operational date2029-09-01
Withdrawn date
Developer
Utility / transmission ownerAMEREN ILLINOIS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata