Felix West Solar (27INR0012)

Felix West Solar is a 200.9 MW solar interconnection project in Wilbarger, Texas with a current status of operational. It is proposed to connect at 6101 Riley 345 kV .

200.9 MWCapacity
OperationalStatus
WilbargerMarket
SolarTechnology

Project facts

Canonical nameFelix West Solar
Queue ID27INR0012
Statusoperational
Source statusSS Completed, FIS Started, IA
MarketWilbarger
TechnologySolar
Capacity200.9 MW
StateTexas
CountyWilbarger
Point of interconnection6101 Riley 345 kV
Requested (queue) date2023-01-17
Proposed in-service date
Operational date2028-12-31
Withdrawn date
DeveloperFelix 1, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata