Felt (6359_2)

Felt is a 2.7 MW other interconnection project in Teton, Idaho with a current status of operational.

2.7 MWCapacity
OperationalStatus
PACEMarket
OtherTechnology

Project facts

Canonical nameFelt
Queue ID6359_2
Statusoperational
Source status(OP) Operating
MarketPACE
TechnologyOther
Capacity2.7 MW
StateIdaho
CountyTeton
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date1986-01-01
Withdrawn date—
Developer—
Utility / transmission ownerFall River Rural Elec Coop Inc

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-11-01
Data last materially changed2026-11-01
Page data generated2026-11-26

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata