Felt (6359_5)

Felt is a 1.1 MW other interconnection project in Teton, Idaho with a current status of operational.

1.1 MWCapacity
OperationalStatus
PACEMarket
OtherTechnology

Project facts

Canonical nameFelt
Queue ID6359_5
Statusoperational
Source status(OP) Operating
MarketPACE
TechnologyOther
Capacity1.1 MW
StateIdaho
CountyTeton
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date1947-09-01
Withdrawn date
Developer
Utility / transmission ownerFall River Rural Elec Coop Inc

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata