Fence Post Solar Hybrid Project, LLC (66801_FNCBE)

Fence Post Solar Hybrid Project, LLC is a 72.0 MW battery interconnection project in Navarro, Texas with a current status of operational.

72.0 MWCapacity
OperationalStatus
ERCOMarket
BatteryTechnology

Project facts

Canonical nameFence Post Solar Hybrid Project, LLC
Queue ID66801_FNCBE
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologyBattery
Capacity72.0 MW
StateTexas
CountyNavarro
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2024-09-01
Withdrawn date
Developer
Utility / transmission ownerFence Post Solar Project, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata