FERMI (11INR0082a)

FERMI is a 149.3 MW wind interconnection project with a current status of operational. It is proposed to connect at 181751 & 181752 Rockspring W 34.5kV.

149.3 MWCapacity
OperationalStatus
ERCOTMarket
WindTechnology

Project facts

Canonical nameFERMI
Queue ID11INR0082a
Statusoperational
Source statusoperational
MarketERCOT
TechnologyWind
Capacity149.3 MW
State
County
Point of interconnection181751 & 181752 Rockspring W 34.5kV
Requested (queue) date2010-01-11
Proposed in-service date2017-11-01
Operational date2017-10-26
Withdrawn date
DeveloperAkuo Energy USA
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata