File Cabinet Storage (C24-272)

File Cabinet Storage is a 100.0 MW battery interconnection project in Ulster, New York with a current status of withdrawn. It is proposed to connect at GALEVILLE to KERHONKS 115 kV.

100.0 MWCapacity
WithdrawnStatus
NYISOMarket
BatteryTechnology

Project facts

Canonical nameFile Cabinet Storage
Queue IDC24-272
Statuswithdrawn
Source statuswithdrawn
MarketNYISO
TechnologyBattery
Capacity100.0 MW
StateNew York
CountyUlster
Point of interconnectionGALEVILLE to KERHONKS 115 kV
Requested (queue) date2024-09-24
Proposed in-service date
Operational date
Withdrawn date
DeveloperKerhonkson, LLC
Utility / transmission ownerCHGE

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.