Findley BESS (28INR0048)

Findley BESS is a 51.7 MW other interconnection project in Limestone, Texas with a current status of operational. It is proposed to connect at Tap 69kV #107 Prairie Hill - #99 Ben Hur .

51.7 MWCapacity
OperationalStatus
LimestoneMarket
OtherTechnology

Project facts

Canonical nameFindley BESS
Queue ID28INR0048
Statusoperational
Source statusSS Completed, FIS Completed, No IA
MarketLimestone
TechnologyOther
Capacity51.7 MW
StateTexas
CountyLimestone
Point of interconnectionTap 69kV #107 Prairie Hill - #99 Ben Hur
Requested (queue) date2024-02-07
Proposed in-service date
Operational date2028-01-01
Withdrawn date
DeveloperAdon Texas Sixteen LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata