Firefly Fields Storage (29INR0123)

Firefly Fields Storage is a 156.5 MW other interconnection project in Colorado, Texas with a current status of operational. It is proposed to connect at Tap 138 kV 57640 Rock Island to 7258 Glidden.

156.5 MWCapacity
OperationalStatus
ColoradoMarket
OtherTechnology

Project facts

Canonical nameFirefly Fields Storage
Queue ID29INR0123
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketColorado
TechnologyOther
Capacity156.5 MW
StateTexas
CountyColorado
Point of interconnectionTap 138 kV 57640 Rock Island to 7258 Glidden
Requested (queue) date2025-03-24
Proposed in-service date
Operational date2028-09-30
Withdrawn date
DeveloperFirefly Fields Energy Center LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata