Five Corners Substation - NG Western MA Area Cluster Study (814)

Five Corners Substation - NG Western MA Area Cluster Study is a 3.0 MW solar interconnection project in Hampshire, Massachusetts with a current status of operational. It is proposed to connect at NG Five Corners Substation.

3.0 MWCapacity
OperationalStatus
WMAMarket
SolarTechnology

Project facts

Canonical nameFive Corners Substation - NG Western MA Area Cluster Study
Queue ID814
Statusoperational
Source statusC
MarketWMA
TechnologySolar
Capacity3.0 MW
StateMassachusetts
CountyHampshire
Point of interconnectionNG Five Corners Substation
Requested (queue) date2018-12-14
Proposed in-service date
Operational date2021-07-29
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata