Five Wells Solar Center - Hybrid (66420_FWBAT)

Five Wells Solar Center - Hybrid is a 262.5 MW battery interconnection project in Bell, Texas with a current status of operational.

262.5 MWCapacity
OperationalStatus
ERCOMarket
BatteryTechnology

Project facts

Canonical nameFive Wells Solar Center - Hybrid
Queue ID66420_FWBAT
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologyBattery
Capacity262.5 MW
StateTexas
CountyBell
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2024-07-01
Withdrawn date
Developer
Utility / transmission ownerFive Wells Solar Center, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata