Five Wells Solar Center - Hybrid (66420_FWSOL)

Five Wells Solar Center - Hybrid is a 355.4 MW solar interconnection project in Bell, Texas with a current status of operational.

355.4 MWCapacity
OperationalStatus
ERCOMarket
SolarTechnology

Project facts

Canonical nameFive Wells Solar Center - Hybrid
Queue ID66420_FWSOL
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologySolar
Capacity355.4 MW
StateTexas
CountyBell
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2023-12-01
Withdrawn date
Developer
Utility / transmission ownerFive Wells Solar Center, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata