FL Queue Project 018679 — Solar in Citrus, Florida

FL Queue Project 018679 — Solar in Citrus, Florida is a 50.0 MW solar interconnection project in Citrus, Florida with a current status of withdrawn. It is proposed to connect at Floral City Substation.

50.0 MWCapacity
WithdrawnStatus
FLMarket
SolarTechnology

Project facts

Canonical nameFL Queue Project 018679 — Solar in Citrus, Florida
Queue ID018679
Statuswithdrawn
Source statusWithdrawn
MarketFL
TechnologySolar
Capacity50.0 MW
StateFlorida
CountyCitrus
Point of interconnectionFloral City Substation
Requested (queue) date2016-05-04
Proposed in-service date2021-06-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata