FL Queue Project 018683 — Other in Polk, Florida

FL Queue Project 018683 — Other in Polk, Florida is a 58.4 MW other interconnection project in Polk, Florida with a current status of withdrawn. It is proposed to connect at Fort Meade Substation.

58.4 MWCapacity
WithdrawnStatus
FLMarket
OtherTechnology

Project facts

Canonical nameFL Queue Project 018683 — Other in Polk, Florida
Queue ID018683
Statuswithdrawn
Source statusWithdrawn
MarketFL
TechnologyOther
Capacity58.4 MW
StateFlorida
CountyPolk
Point of interconnectionFort Meade Substation
Requested (queue) date2012-06-12
Proposed in-service date2014-07-05
Operational date
Withdrawn date
Developer
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.