FL Queue Project 018716 — Solar in Osceola, Florida

FL Queue Project 018716 — Solar in Osceola, Florida is a 616.6 MW solar interconnection project in Osceola, Florida with a current status of withdrawn. It is proposed to connect at Holopaw Substation.

616.6 MWCapacity
WithdrawnStatus
FLMarket
SolarTechnology

Project facts

Canonical nameFL Queue Project 018716 — Solar in Osceola, Florida
Queue ID018716
Statuswithdrawn
Source statusWithdrawn 12/31/2018
MarketFL
TechnologySolar
Capacity616.6 MW
StateFlorida
CountyOsceola
Point of interconnectionHolopaw Substation
Requested (queue) date2016-05-04
Proposed in-service date—
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_project—withdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-10-12

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata