FL Queue Project 019863 — Solar in Lake, Florida

FL Queue Project 019863 — Solar in Lake, Florida is a 20.0 MW solar interconnection project in Lake, Florida with a current status of withdrawn. It is proposed to connect at Haines Creek Substation.

20.0 MWCapacity
WithdrawnStatus
FLMarket
SolarTechnology

Project facts

Canonical nameFL Queue Project 019863 — Solar in Lake, Florida
Queue ID019863
Statuswithdrawn
Source statusWithdrawn
MarketFL
TechnologySolar
Capacity20.0 MW
StateFlorida
CountyLake
Point of interconnectionHaines Creek Substation
Requested (queue) date2017-06-12
Proposed in-service date2019-08-30
Operational date
Withdrawn date
Developer
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.