FL Queue Project 019865 — Solar in Gilchrist, Florida

FL Queue Project 019865 — Solar in Gilchrist, Florida is a 30.0 MW solar interconnection project in Gilchrist, Florida with a current status of withdrawn. It is proposed to connect at Ginnie Substation.

30.0 MWCapacity
WithdrawnStatus
FLMarket
SolarTechnology

Project facts

Canonical nameFL Queue Project 019865 — Solar in Gilchrist, Florida
Queue ID019865
Statuswithdrawn
Source statusWithdrawn 12/31/2020
MarketFL
TechnologySolar
Capacity30.0 MW
StateFlorida
CountyGilchrist
Point of interconnectionGinnie Substation
Requested (queue) date2017-06-20
Proposed in-service date—
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_project—withdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-10-12

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.