FL Queue Project 019878 — Solar in Citrus, Florida

FL Queue Project 019878 — Solar in Citrus, Florida is a 40.0 MW solar interconnection project in Citrus, Florida with a current status of withdrawn. It is proposed to connect at Dunnellon Town - Inglis.

40.0 MWCapacity
WithdrawnStatus
FLMarket
SolarTechnology

Project facts

Canonical nameFL Queue Project 019878 — Solar in Citrus, Florida
Queue ID019878
Statuswithdrawn
Source statusWithdrawn mm ae tr erc i Da el lO lp ape er ra dat tio ion -
MarketFL
TechnologySolar
Capacity40.0 MW
StateFlorida
CountyCitrus
Point of interconnectionDunnellon Town - Inglis
Requested (queue) date2017-09-22
Proposed in-service date2019-09-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.