FL Queue Project 019936 — Solar in Suwannee, Florida is a 36.0 MW solar interconnection project in Suwannee, Florida with a current status of withdrawn. It is proposed to connect at Perry Substation.

36.0 MWCapacity
WithdrawnStatus
FLMarket
SolarTechnology

Project facts

Canonical nameFL Queue Project 019936 — Solar in Suwannee, Florida
Queue ID019936
Statuswithdrawn
Source statusWithdrawn 12/30/2018
MarketFL
TechnologySolar
Capacity36.0 MW
StateFlorida
CountySuwannee
Point of interconnectionPerry Substation
Requested (queue) date2017-11-16
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata