FL Queue Project 019937 — Solar in Levy, Florida

FL Queue Project 019937 — Solar in Levy, Florida is a 74.9 MW solar interconnection project in Levy, Florida with a current status of withdrawn. It is proposed to connect at Bronson-Newberry Line.

74.9 MWCapacity
WithdrawnStatus
FLMarket
SolarTechnology

Project facts

Canonical nameFL Queue Project 019937 — Solar in Levy, Florida
Queue ID019937
Statuswithdrawn
Source statusWithdrawn 10/15/2021
MarketFL
TechnologySolar
Capacity74.9 MW
StateFlorida
CountyLevy
Point of interconnectionBronson-Newberry Line
Requested (queue) date2017-11-22
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata