FL Queue Project 022579 — Solar in Dixie, Florida

FL Queue Project 022579 — Solar in Dixie, Florida is a 70.0 MW solar interconnection project in Dixie, Florida with a current status of withdrawn. It is proposed to connect at Old Town North 69 kV Substation.

70.0 MWCapacity
WithdrawnStatus
FLMarket
SolarTechnology

Project facts

Canonical nameFL Queue Project 022579 — Solar in Dixie, Florida
Queue ID022579
Statuswithdrawn
Source statusWithdrawn 12/31/2018
MarketFL
TechnologySolar
Capacity70.0 MW
StateFlorida
CountyDixie
Point of interconnectionOld Town North 69 kV Substation
Requested (queue) date2018-06-04
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata