FL Queue Project 027066 — Solar in Hardee, Florida

FL Queue Project 027066 — Solar in Hardee, Florida is a 74.9 MW solar interconnection project in Hardee, Florida with a current status of withdrawn. It is proposed to connect at Avon Park - Ft Meade.

74.9 MWCapacity
WithdrawnStatus
FLMarket
SolarTechnology

Project facts

Canonical nameFL Queue Project 027066 — Solar in Hardee, Florida
Queue ID027066
Statuswithdrawn
Source statusWithdrawn mm ae tr erc i Da el lO lp ape er ra dat tio ion -
MarketFL
TechnologySolar
Capacity74.9 MW
StateFlorida
CountyHardee
Point of interconnectionAvon Park - Ft Meade
Requested (queue) date2016-06-07
Proposed in-service date2019-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata