FL Queue Project 027092 — Other in Hamilton, Florida

FL Queue Project 027092 — Other in Hamilton, Florida is a 58.0 MW other interconnection project in Hamilton, Florida with a current status of withdrawn.

58.0 MWCapacity
WithdrawnStatus
FLMarket
OtherTechnology

Project facts

Canonical nameFL Queue Project 027092 — Other in Hamilton, Florida
Queue ID027092
Statuswithdrawn
Source statusWithdrawn 12/31/2011
MarketFL
TechnologyOther
Capacity58.0 MW
StateFlorida
CountyHamilton
Point of interconnection
Requested (queue) date2008-10-06
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata