FL Queue Project 027094 — Other in Hernando, Florida
FL Queue Project 027094 — Other in Hernando, Florida is a 17.0 MW other interconnection project in Hernando, Florida with a current status of withdrawn. It is proposed to connect at Brookridge Substation.
17.0 MWCapacity
WithdrawnStatus
FLMarket
OtherTechnology
Project facts
| Canonical name | FL Queue Project 027094 — Other in Hernando, Florida |
|---|---|
| Queue ID | 027094 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | FL |
| Technology | Other |
| Capacity | 17.0 MW |
| State | Florida |
| County | Hernando |
| Point of interconnection | Brookridge Substation |
| Requested (queue) date | 2009-02-06 |
| Proposed in-service date | 2009-01-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Duke Energy Progress |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata