FL Queue Project 027146 — Other in Hernando, Florida

FL Queue Project 027146 — Other in Hernando, Florida is a 133.0 MW other interconnection project in Hernando, Florida with a current status of withdrawn. It is proposed to connect at Brookridge Substation.

133.0 MWCapacity
WithdrawnStatus
FLMarket
OtherTechnology

Project facts

Canonical nameFL Queue Project 027146 — Other in Hernando, Florida
Queue ID027146
Statuswithdrawn
Source statusWithdrawn
MarketFL
TechnologyOther
Capacity133.0 MW
StateFlorida
CountyHernando
Point of interconnectionBrookridge Substation
Requested (queue) date2005-09-08
Proposed in-service date2005-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.