FL Queue Project 027170 — Other in Highland, Florida

FL Queue Project 027170 — Other in Highland, Florida is a 145.0 MW other interconnection project in Highland, Florida with a current status of withdrawn. It is proposed to connect at Fisheating Creek Substation.

145.0 MWCapacity
WithdrawnStatus
FLMarket
OtherTechnology

Project facts

Canonical nameFL Queue Project 027170 — Other in Highland, Florida
Queue ID027170
Statuswithdrawn
Source statusWithdrawn
MarketFL
TechnologyOther
Capacity145.0 MW
StateFlorida
CountyHighland
Point of interconnectionFisheating Creek Substation
Requested (queue) date2006-09-06
Proposed in-service date2009-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata