FL Queue Project 027244 — Gas in Suwannee, Florida

FL Queue Project 027244 — Gas in Suwannee, Florida is a 950.0 MW gas interconnection project in Suwannee, Florida with a current status of withdrawn. It is proposed to connect at Suwannee 230 kV Substation.

950.0 MWCapacity
WithdrawnStatus
FLMarket
GasTechnology

Project facts

Canonical nameFL Queue Project 027244 — Gas in Suwannee, Florida
Queue ID027244
Statuswithdrawn
Source statusWithdrawn
MarketFL
TechnologyGas
Capacity950.0 MW
StateFlorida
CountySuwannee
Point of interconnectionSuwannee 230 kV Substation
Requested (queue) date2011-07-22
Proposed in-service date2018-04-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.