FL Queue Project 027264 — Solar in Lake, Florida

FL Queue Project 027264 — Solar in Lake, Florida is a 100.0 MW solar interconnection project in Lake, Florida with a current status of withdrawn. It is proposed to connect at Sorrento Substation 69 kV.

100.0 MWCapacity
WithdrawnStatus
FLMarket
SolarTechnology

Project facts

Canonical nameFL Queue Project 027264 — Solar in Lake, Florida
Queue ID027264
Statuswithdrawn
Source statusWithdrawn 12/31/2011
MarketFL
TechnologySolar
Capacity100.0 MW
StateFlorida
CountyLake
Point of interconnectionSorrento Substation 69 kV
Requested (queue) date2011-08-30
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata