FL Queue Project 027270 — Generation in Pasco, Florida

FL Queue Project 027270 — Generation in Pasco, Florida is a 220.0 MW generation interconnection project in Pasco, Florida with a current status of withdrawn. It is proposed to connect at Hudson Substation.

220.0 MWCapacity
WithdrawnStatus
FLMarket
GenerationTechnology

Project facts

Canonical nameFL Queue Project 027270 — Generation in Pasco, Florida
Queue ID027270
Statuswithdrawn
Source statusWithdrawn
MarketFL
TechnologyGeneration
Capacity220.0 MW
StateFlorida
CountyPasco
Point of interconnectionHudson Substation
Requested (queue) date2012-01-18
Proposed in-service date2015-06-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata