FL Queue Project 027276 — Generation in Lake, Florida

FL Queue Project 027276 — Generation in Lake, Florida is a 110.0 MW generation interconnection project in Lake, Florida with a current status of withdrawn. It is proposed to connect at Enola Substation.

110.0 MWCapacity
WithdrawnStatus
FLMarket
GenerationTechnology

Project facts

Canonical nameFL Queue Project 027276 — Generation in Lake, Florida
Queue ID027276
Statuswithdrawn
Source statusWithdrawn
MarketFL
TechnologyGeneration
Capacity110.0 MW
StateFlorida
CountyLake
Point of interconnectionEnola Substation
Requested (queue) date2013-06-19
Proposed in-service date1993-07-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_project—withdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-10-12

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata