FL Queue Project 027286 — Gas in Pasco, Florida

FL Queue Project 027286 — Gas in Pasco, Florida is a 345.0 MW gas interconnection project in Pasco, Florida with a current status of withdrawn. It is proposed to connect at Hudson Substation.

345.0 MWCapacity
WithdrawnStatus
FLMarket
GasTechnology

Project facts

Canonical nameFL Queue Project 027286 — Gas in Pasco, Florida
Queue ID027286
Statuswithdrawn
Source statusWithdrawn 12/31/2009
MarketFL
TechnologyGas
Capacity345.0 MW
StateFlorida
CountyPasco
Point of interconnectionHudson Substation
Requested (queue) date2008-01-25
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata