FL Queue Project 027318 — Generation in Pasco, Florida

FL Queue Project 027318 — Generation in Pasco, Florida is a 400.0 MW generation interconnection project in Pasco, Florida with a current status of withdrawn. It is proposed to connect at Hudson Substation.

400.0 MWCapacity
WithdrawnStatus
FLMarket
GenerationTechnology

Project facts

Canonical nameFL Queue Project 027318 — Generation in Pasco, Florida
Queue ID027318
Statuswithdrawn
Source statusWithdrawn
MarketFL
TechnologyGeneration
Capacity400.0 MW
StateFlorida
CountyPasco
Point of interconnectionHudson Substation
Requested (queue) date2014-01-16
Proposed in-service date2018-02-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.