FL Queue Project 027332 — Gas in Hardee, Florida

FL Queue Project 027332 — Gas in Hardee, Florida is a 966.0 MW gas interconnection project in Hardee, Florida with a current status of withdrawn.

966.0 MWCapacity
WithdrawnStatus
FLMarket
GasTechnology

Project facts

Canonical nameFL Queue Project 027332 — Gas in Hardee, Florida
Queue ID027332
Statuswithdrawn
Source statusWithdrawn
MarketFL
TechnologyGas
Capacity966.0 MW
StateFlorida
CountyHardee
Point of interconnection
Requested (queue) date2008-07-14
Proposed in-service date2013-06-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata