FL Queue Project 027334 — Gas in Gilchrist, Florida
FL Queue Project 027334 — Gas in Gilchrist, Florida is a 868.0 MW gas interconnection project in Gilchrist, Florida with a current status of withdrawn. It is proposed to connect at Gilchrist Substation.
868.0 MWCapacity
WithdrawnStatus
FLMarket
GasTechnology
Project facts
| Canonical name | FL Queue Project 027334 — Gas in Gilchrist, Florida |
|---|---|
| Queue ID | 027334 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | FL |
| Technology | Gas |
| Capacity | 868.0 MW |
| State | Florida |
| County | Gilchrist |
| Point of interconnection | Gilchrist Substation |
| Requested (queue) date | 2008-07-15 |
| Proposed in-service date | 2014-06-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Duke Energy Progress |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.