FL Queue Project 027336 — Gas in Perry, Florida

FL Queue Project 027336 — Gas in Perry, Florida is a 293.0 MW gas interconnection project in Perry, Florida with a current status of withdrawn. It is proposed to connect at Perry Substation.

293.0 MWCapacity
WithdrawnStatus
FLMarket
GasTechnology

Project facts

Canonical nameFL Queue Project 027336 — Gas in Perry, Florida
Queue ID027336
Statuswithdrawn
Source statusWithdrawn
MarketFL
TechnologyGas
Capacity293.0 MW
StateFlorida
CountyPerry
Point of interconnectionPerry Substation
Requested (queue) date2008-07-31
Proposed in-service date2013-06-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata