FL Queue Project 030898 — Solar in Polk, Florida

FL Queue Project 030898 — Solar in Polk, Florida is a 55.0 MW solar interconnection project in Polk, Florida with a current status of withdrawn. It is proposed to connect at Fort Meade to West Lake Wales.

55.0 MWCapacity
WithdrawnStatus
FLMarket
SolarTechnology

Project facts

Canonical nameFL Queue Project 030898 — Solar in Polk, Florida
Queue ID030898
Statuswithdrawn
Source statusWithdrawn
MarketFL
TechnologySolar
Capacity55.0 MW
StateFlorida
CountyPolk
Point of interconnectionFort Meade to West Lake Wales
Requested (queue) date2019-02-13
Proposed in-service date2021-08-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata