FL Queue Project 033052 — Solar in Gilchrist, Florida

FL Queue Project 033052 — Solar in Gilchrist, Florida is a 74.9 MW solar interconnection project in Gilchrist, Florida with a current status of withdrawn. It is proposed to connect at Trenton - Wilcox.

74.9 MWCapacity
WithdrawnStatus
FLMarket
SolarTechnology

Project facts

Canonical nameFL Queue Project 033052 — Solar in Gilchrist, Florida
Queue ID033052
Statuswithdrawn
Source statusWithdrawn rn et ee mrc eo nn tn -e Pc et nio dn
MarketFL
TechnologySolar
Capacity74.9 MW
StateFlorida
CountyGilchrist
Point of interconnectionTrenton - Wilcox
Requested (queue) date2018-02-16
Proposed in-service date2021-09-30
Operational date
Withdrawn date
Developer
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata