FL Queue Project 037352 — Solar in Marion, Florida

FL Queue Project 037352 — Solar in Marion, Florida is a 20.0 MW solar interconnection project in Marion, Florida with a current status of withdrawn. It is proposed to connect at Martin West Substation.

20.0 MWCapacity
WithdrawnStatus
FLMarket
SolarTechnology

Project facts

Canonical nameFL Queue Project 037352 — Solar in Marion, Florida
Queue ID037352
Statuswithdrawn
Source statusWithdrawn
MarketFL
TechnologySolar
Capacity20.0 MW
StateFlorida
CountyMarion
Point of interconnectionMartin West Substation
Requested (queue) date2019-05-24
Proposed in-service date2021-08-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata