FL Queue Project 054704 — Solar in Sumter, Florida

FL Queue Project 054704 — Solar in Sumter, Florida is a 74.5 MW solar interconnection project in Sumter, Florida with a current status of withdrawn. It is proposed to connect at Central Florida - Holder.

74.5 MWCapacity
WithdrawnStatus
FLMarket
SolarTechnology

Project facts

Canonical nameFL Queue Project 054704 — Solar in Sumter, Florida
Queue ID054704
Statuswithdrawn
Source statusWithdrawn 12/31/2022 et ee mrc eo nn n –e Pc eti no dn
MarketFL
TechnologySolar
Capacity74.5 MW
StateFlorida
CountySumter
Point of interconnectionCentral Florida - Holder
Requested (queue) date2019-11-01
Proposed in-service date—
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_project—withdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-11-26

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata