FL Queue Project 071008 — Solar in Osceola, Florida

FL Queue Project 071008 — Solar in Osceola, Florida is a 74.3 MW solar interconnection project in Osceola, Florida with a current status of withdrawn. It is proposed to connect at Whippoorwill Switching Station.

74.3 MWCapacity
WithdrawnStatus
FLMarket
SolarTechnology

Project facts

Canonical nameFL Queue Project 071008 — Solar in Osceola, Florida
Queue ID071008
Statuswithdrawn
Source statusWithdrawn
MarketFL
TechnologySolar
Capacity74.3 MW
StateFlorida
CountyOsceola
Point of interconnectionWhippoorwill Switching Station
Requested (queue) date2020-03-27
Proposed in-service date2023-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata