FL Queue Project 12 — Gas in an unlisted county, Florida

FL Queue Project 12 — Gas in an unlisted county, Florida is a 5.0 MW gas interconnection project with a current status of withdrawn. It is proposed to connect at Water Oak.

5.0 MWCapacity
WithdrawnStatus
FLMarket
GasTechnology

Project facts

Canonical nameFL Queue Project 12 — Gas in an unlisted county, Florida
Queue ID12
Statuswithdrawn
Source statusWithdrawn by Customer on 06/06/2015
MarketFL
TechnologyGas
Capacity5.0 MW
StateFlorida
County
Point of interconnectionWater Oak
Requested (queue) date2015-09-29
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerSeminole Electric Cooperative

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: seminole-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.