FL Queue Project 16 — Gas in an unlisted county, Florida

FL Queue Project 16 — Gas in an unlisted county, Florida is a 1,190.0 MW gas interconnection project with a current status of withdrawn. It is proposed to connect at SGS Switchyard.

1,190.0 MWCapacity
WithdrawnStatus
FLMarket
GasTechnology

Project facts

Canonical nameFL Queue Project 16 — Gas in an unlisted county, Florida
Queue ID16
Statuswithdrawn
Source statusWithdrawn and replaced by Queue 19
MarketFL
TechnologyGas
Capacity1,190.0 MW
StateFlorida
County
Point of interconnectionSGS Switchyard
Requested (queue) date2016-05-05
Proposed in-service date2020-03-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerSeminole Electric Cooperative

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: seminole-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata