FL Queue Project 221324 — Solar in Manatee, Florida

FL Queue Project 221324 — Solar in Manatee, Florida is a 74.5 MW solar interconnection project in Manatee, Florida with a current status of withdrawn. It is proposed to connect at Dry Prairie Substation.

74.5 MWCapacity
WithdrawnStatus
FLMarket
SolarTechnology

Project facts

Canonical nameFL Queue Project 221324 — Solar in Manatee, Florida
Queue ID221324
Statuswithdrawn
Source statusWithdrawn
MarketFL
TechnologySolar
Capacity74.5 MW
StateFlorida
CountyManatee
Point of interconnectionDry Prairie Substation
Requested (queue) date2021-12-14
Proposed in-service date2024-06-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata