FL Queue Project 239782 — Solar in Highlands, Florida

FL Queue Project 239782 — Solar in Highlands, Florida is a 74.9 MW solar interconnection project in Highlands, Florida with a current status of withdrawn. It is proposed to connect at Fisheating Creek Substation.

74.9 MWCapacity
WithdrawnStatus
FLMarket
SolarTechnology

Project facts

Canonical nameFL Queue Project 239782 — Solar in Highlands, Florida
Queue ID239782
Statuswithdrawn
Source statusWithdrawn
MarketFL
TechnologySolar
Capacity74.9 MW
StateFlorida
CountyHighlands
Point of interconnectionFisheating Creek Substation
Requested (queue) date2022-03-26
Proposed in-service date2024-06-30
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_project—withdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-11-26

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata