FL Queue Project 24 — Solar in an unlisted county, Florida
FL Queue Project 24 — Solar in an unlisted county, Florida is a 74.5 MW solar interconnection project with a current status of withdrawn. It is proposed to connect at N/A.
74.5 MWCapacity
WithdrawnStatus
FLMarket
SolarTechnology
Project facts
| Canonical name | FL Queue Project 24 — Solar in an unlisted county, Florida |
|---|---|
| Queue ID | 24 |
| Status | withdrawn |
| Source status | SIS Complete 12/23/2019 Withdrawn by Customer on 01/21/2020 |
| Market | FL |
| Technology | Solar |
| Capacity | 74.5 MW |
| State | Florida |
| County | — |
| Point of interconnection | N/A |
| Requested (queue) date | 2018-10-17 |
| Proposed in-service date | 2020-12-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Seminole Electric Cooperative |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28
Provenance: seminole-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata