FL Queue Project 33 — Solar in an unlisted county, Florida

FL Queue Project 33 — Solar in an unlisted county, Florida is a 1.8 MW solar interconnection project with a current status of operational. It is proposed to connect at Timberwood/Ocala.

1.8 MWCapacity
OperationalStatus
FLMarket
SolarTechnology

Project facts

Canonical nameFL Queue Project 33 — Solar in an unlisted county, Florida
Queue ID33
Statusoperational
Source statusCompleted and in-service
MarketFL
TechnologySolar
Capacity1.8 MW
StateFlorida
County—
Point of interconnectionTimberwood/Ocala
Requested (queue) date2023-08-08
Proposed in-service date—
Operational date2024-04-01
Withdrawn date—
Developer—
Utility / transmission ownerSeminole Electric Cooperative

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_project—operationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-10-12

Provenance: seminole-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata