FL Queue Project 35 — Solar+Battery in an unlisted county, Florida

FL Queue Project 35 — Solar+Battery in an unlisted county, Florida is a 24.4 MW solar+battery interconnection project with a current status of withdrawn. It is proposed to connect at SGS Switchyard.

24.4 MWCapacity
WithdrawnStatus
FLMarket
Solar+BatteryTechnology

Project facts

Canonical nameFL Queue Project 35 — Solar+Battery in an unlisted county, Florida
Queue ID35
Statuswithdrawn
Source statusWithdrawn
MarketFL
TechnologySolar+Battery
Capacity24.4 MW
StateFlorida
County
Point of interconnectionSGS Switchyard
Requested (queue) date2023-12-01
Proposed in-service date2028-06-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerSeminole Electric Cooperative

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: seminole-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata