FL Queue Project 398 — Solar in Putnam, Florida

FL Queue Project 398 — Solar in Putnam, Florida is a 74.5 MW solar interconnection project in Putnam, Florida with a current status of active. It is proposed to connect at Carter-Duval.

74.5 MWCapacity
ActiveStatus
FLMarket
SolarTechnology

Project facts

Canonical nameFL Queue Project 398 — Solar in Putnam, Florida
Queue ID398
Statusactive
Source statusIn Queue
MarketFL
TechnologySolar
Capacity74.5 MW
StateFlorida
CountyPutnam
Point of interconnectionCarter-Duval
Requested (queue) date2020-07-21
Proposed in-service date2032-07-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerFlorida Power & Light

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: fpl-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata