FL Queue Project 418 — Gas in Miami-Dade, Florida

FL Queue Project 418 — Gas in Miami-Dade, Florida is a 99.0 MW gas interconnection project in Miami-Dade, Florida with a current status of operational. It is proposed to connect at Turkey Point Sub.

99.0 MWCapacity
OperationalStatus
FLMarket
GasTechnology

Project facts

Canonical nameFL Queue Project 418 — Gas in Miami-Dade, Florida
Queue ID418
Statusoperational
Source statusIn-Service
MarketFL
TechnologyGas
Capacity99.0 MW
StateFlorida
CountyMiami-Dade
Point of interconnectionTurkey Point Sub
Requested (queue) date2020-09-18
Proposed in-service date
Operational date2025-03-01
Withdrawn date
Developer
Utility / transmission ownerFlorida Power & Light

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: fpl-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata