FL Queue Project 425 — Solar+Battery in Bradford, Florida

FL Queue Project 425 — Solar+Battery in Bradford, Florida is a 74.9 MW solar+battery interconnection project in Bradford, Florida with a current status of active. It is proposed to connect at Deerhaven (GVL)-Bradford 138kV.

74.9 MWCapacity
ActiveStatus
FLMarket
Solar+BatteryTechnology

Project facts

Canonical nameFL Queue Project 425 — Solar+Battery in Bradford, Florida
Queue ID425
Statusactive
Source statusIA Executed
MarketFL
TechnologySolar+Battery
Capacity74.9 MW
StateFlorida
CountyBradford
Point of interconnectionDeerhaven (GVL)-Bradford 138kV
Requested (queue) date2021-08-20
Proposed in-service date2028-08-05
Operational date
Withdrawn date
Developer
Utility / transmission ownerFlorida Power & Light

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: fpl-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata